Project Execution Methodology
Basic Engineering activities
- Document control Index.
- Design Basis
- Sizing calculation
- Load flow and short circuit study on ETAP.
- Switchyard equipments
- Transformer (Power / Distribution / Lighting)
- Switchyard structure (Out sourced)
- Cables (Voltage drop & short circuit )
- Capacitor
- DG sizing
- DC system
- Lighting
Earthing based on soil resistivity report.
- Earth mat calculation for switchyard.
- Earthing grid calculation for plant.
- Lightning protection calculation
- Single line diagram.
- Typical control scheme with DCS/ PLC Interface.
- Technical specification and Data sheet.
- QAP for bought out equipments.
- Vendor drawing review/ Approval.
- Electrical IO List.
- Relay co-ordination
Field engineering activities
- Cable schedule.
- Cable termination schedule.
- Layout drawing.
- Equipment layout for Electrical Rooms.
- Switchyard layout drawing.
- Earthing and Lightning Protection layout drawing.
- Cable Layout drawing.
- Lighting layout drawing with distribution diagrams.
Erection & Commissioning activities
- Establishment of Site Office
- Erection Schedule
- Verification of Material received at site.
- Mobilization of man power
- Positioning of equipments.
- Cable Tray Erection
- Lighting
- Earthing & Lightning Protection
- Cable laying
- Cable termination
- Testing & No load Trials
- Statutory approvals
- Load trials
- Preparation of as built drawings.
- Handing over of plant
|
 |
|